|
PM Performs Bhoomi Pujan for Kaziranga Elevated Wildlife Corridor Project in Assam
The Prime Minister performs the Bhoomi Pujan of the Kaziranga Elevated Wildlife Corridor Project in Assam. The project is approved by the Cabinet Committee on Economic Affairs (CCEA) and is implemented to improve regional connectivity while ensuring protection of Kaziranga’s biodiversity.
Kaziranga Elevated Wildlife Corridor Project (Assam):
| Dimension | Key Details |
|---|---|
| Aim | Provides for improving regional connectivity while ensuring protection of Kaziranga’s rich biodiversity. |
| Location and wildlife linkage | Comprises a corridor connecting Kaziranga National Park with the Karbi Anglong Hills wildlife movement route in Assam; runs through and along the southern boundary of Kaziranga National Park. |
| Districts covered | Nagaon, Karbi Anglong and Golaghat districts. |
| National Highway section | Kaliabor–Numaligarh section of NH-715 in Assam. |
| Approval authority and date | Cabinet Committee on Economic Affairs (CCEA) on 1 October 2025. |
| Implementation mode | Engineering, Procurement and Construction (EPC) mode. |
| Project components | 35 km Elevated Wildlife Corridor, 21 km greenfield bypasses, and 30 km widening of the existing highway from two to four lanes. |
| Wildlife-related provisions | Uninterrupted movement of wildlife during floods; reduces human–wildlife conflict and animal deaths on NH-715. |
| Urban decongestion | Decongesting Jakhalabandha (Nagaon) and Bokakhat (Golaghat) towns. |
| Transport outcomes | Improved road safety, reduced travel time and accident rates, and facilitates growing passenger and freight traffic. |
| Regional connectivity | Connectivity between Upper Assam and Arunachal Pradesh. |
| Ecological significance | Protects a UNESCO World Heritage Site; supports India’s flagship conservation efforts like Project Rhino; aligns with principles of sustainable development and eco-sensitive infrastructure. |