Sharavathi Hydroelectric Project

|

Sharavathi Hydroelectric Project

Environment
Sharavathi Hydroelectric Project

The Karnataka High Court halted the Sharavathi Hydro Electric Project due to environmental concerns in the ecologically sensitive Western Ghats.

Sharavathi Hydro Project & Region :

Aspect Key Details
Project Launch Proposed in 2017.
Location Sharavathi Lion-Tailed Macaque Wildlife Sanctuary, Shivamogga district, Karnataka.
Implementing Agency Karnataka Power Corporation Limited (KPCL).
Objective Generate 2,000 MW power and integrate renewable energy sources like solar and wind.
Type of Project Pumped Storage Hydropower (acts as a “water battery”).
Working Mechanism Uses two reservoirs at different elevations; pumps water during low demand and releases it during peak demand to generate electricity.
Efficiency About 70–80% round-trip efficiency.
Environmental Concerns Tree felling (~7,000–8,000), threat to lion-tailed macaques, wet evergreen forests and ecosystem integrity.
Judicial Action Karnataka High Court directed halt of project work.
Sharavathi River Origin Ambutirtha, Thirthahalli (Western Ghats).
River Flow West-flowing river draining into the Arabian Sea at Honnavar (~130 km).
Major Dams Linganamakki Dam, Gersoppa Dam, Hirebhaskara (submerged).
Waterfall Jog Falls (one of India’s highest plunge waterfalls).
Sanctuary Establishment 1972 (expanded and renamed in 2019).
Area 431.23 sq km.
Key Species Lion-tailed macaque (endemic and endangered).
Ecological Significance Part of Western Ghats biodiversity hotspot with rich wet evergreen forests.
Did you find this informative?

Attempt Possible Qs

Q 1 / 3

Consider the following as environmental concerns associated with the Sharavathi Hydro Electric Project:

1. Tree felling of about 7,000–8,000 trees.
2. Threat to lion-tailed macaques.
3. Threat to wet evergreen forests and ecosystem integrity.

Which of the statements given above are correct?