|
ISRO Plans GISAT-1A (EOS-05) Launch in September 2026
ISRO is planning to launch GISAT-1A (EOS-05) in September 2026, as a replacement mission designated F17. The planned launch is in focus as it follows the failure of GISAT-1/EOS-03 in 2021 and comes after recent PSLV launch failures.
GISAT Programme and Related Facts:
| Dimension | Key Details |
|---|---|
| Developer | GISAT-1A is developed by the Indian Space Research Organisation (ISRO). |
| Satellite type and observation feature | GISAT is a Geo-Imaging Satellite designed for wide-area and near-continuous observation of the Indian subcontinent. |
| Observation coverage | GISAT-1A is intended to observe the Indian landmass for large parts of the day. |
| Applications | GISAT applications comprise flood monitoring, cyclone tracking, agriculture, forestry, and monitoring rapid changes on the Earth's surface. |
| Earlier mission failure | GISAT-1/EOS-03 is launched in August 2021 using GSLV Mk-II. |
| Earlier mission planned orbit sequence | GISAT-1/EOS-03 is supposed to first enter a Geosynchronous Transfer Orbit (GTO) and then move to a geostationary orbit. |
| Failure point and cause chain | The GISAT-1/EOS-03 mission fails when the cryogenic upper stage does not start, and the failure is linked to a valve leak that reduces pressure in the liquid hydrogen tank. |
| Cryogenic stage propellants | The cryogenic stage uses liquid hydrogen as fuel and liquid oxygen as oxidiser. |
| Orbit concept: GTO | Geosynchronous Transfer Orbit (GTO) is a highly elliptical orbit (170 km - 36,000 km) used as an intermediate orbit before reaching geostationary orbit. |
| Orbit concept: Geostationary | Geostationary orbit provides that a satellite appears fixed relative to a point on Earth, and it is particularly useful for continuous observation and communication. |
| Launch vehicles: stages | PSLV (4), GSLV Mk-II (3), and LVM-3 (3). |
| Launch vehicles: cryogenic stage presence | PSLV (No), GSLV Mk-II (Yes), and LVM-3 (Yes). |
| Launch vehicles: cryogenic engines | GSLV Mk-II (CE7.5) and LVM-3 (CE20). |
| Launch vehicles: GTO capacity | GSLV Mk-II (up to 2.5 tonnes) and LVM-3 (up to 4 tonnes). |
| PSLV–GSLV Mk-II commonality | PSLV and GSLV Mk-II share some design elements, including the S139 first-stage solid motor lineage, and share aspects of avionics, guidance, tracking, and separation systems. |
| Recent ISRO launch issues | Recent failures comprise PSLV-C61 carrying EOS-09 (May 2025) and PSLV-C62 carrying N1 satellite (January 2026), and both failures involve anomalies during the third stage. |
| Operational response to failures | ISRO subsequently has paused launches while failure causes are investigated. |
| NavIC linkage: mission intent | GSLV-F15/NVS-02 is intended to strengthen India's NavIC constellation. |
| NavIC service coverage and type | NavIC provides Positioning, Navigation and Timing (PNT) services over the Indian subcontinent. |
| NavIC constellation requirement | Following the NVS-02 problem, the constellation has only 3 satellites, whereas at least 4 are required for PNT services. |
| Upcoming related mission | NVS-03 is expected to be launched subsequently. |
| Human spaceflight linkage | LVM-3 is planned to be upgraded into a human-rated LVM-3, and it is intended to launch Indian astronauts under the Gaganyaan programme. |