Government Receives 20 Bids Under Rare Earth Permanent Magnets Scheme

|

Government Receives 20 Bids Under Rare Earth Permanent Magnets Scheme

Schemes
Government Receives 20 Bids Under Rare Earth Permanent Magnets Scheme

The government receives 20 bids for a rare earth permanent magnet (REPM) manufacturing scheme. The scheme provides for setting up integrated REPM manufacturing capacity in India with a defined outlay, duration, and beneficiary allocation mechanism.

Rare Earth Permanent Magnets (REPM) Manufacturing Scheme:

Dimension Key Details
Objective The scheme provides for establishment of 6,000 Metric Tons per Annum (MTPA) of integrated REPM manufacturing in India.
Financial outlay The scheme comprises an outlay of ₹7,280 crore.
Total duration The scheme comprises a total duration of 7 years.
Phasing within duration The scheme comprises 2 years for facility setup (gestation period) and 5 years for incentive disbursement on sales.
Beneficiary allocation The scheme mandates allocation of 6,000 MTPA capacity to 5 beneficiaries through global competitive bidding.
Manufacturing integration The scheme provides for end-to-end facilities covering complete processing: rare earth oxides, metals, alloys, and finished rare earth permanent magnets.
REPM characteristics REPMs comprise amongst the strongest types of permanent magnets, and their high magnetic strength and stability make them integral to multiple systems.
REPM applications REPMs comprise applications in EV motors, wind turbine generators, consumer and industrial electronics, and aerospace and defence systems.
Did you find this informative?

Attempt Possible Qs

Q 1 / 2
Consider the following statements about the Rare Earth Permanent Magnets (REPM) manufacturing scheme:

1. The scheme targets 6,000 MTPA of integrated REPM manufacturing capacity in India.
2. The scheme has a total duration of 7 years, including 2 years for facility setup and 5 years for incentive disbursement on sales.
3. The scheme mandates allocation of the entire targeted capacity to 6 beneficiaries through global competitive bidding.

Which of the statements given above are correct?